Installation Guidance

Required Tools For proper Installtaion
Power Tools (Optional)
•
Table Saw, Electric
Miter Saw, Band Saw, Chop Saw, Power Jamb Saw, or Jig Saw
Hand Tools (Optional)
•
Broom and dust pan or Vacuum
•
Tape Measure
•
Moisture meter (wood, concrete or both)
•
Chalk line & chalk
•
3M Blue Tape
•
Hand saw
•
Hammer
•
Rubber mallet
•
Tapping block
•
Pry bar
•
Filler stick and Touch-up marker
•
Hardwood Floor Cleaner
Additional
Tools for Glue-Down
(Optional)
•
Recommended
Adhesive & Adhesive
Remover
•
Trowel (Follow adhesive
manufacturer’s instruction)
Additional
Tools for Staple-Down Installation (Optional)
•
Pneumatic Stapler/Nailer (Goodfellow recommends the HIGH PRO stapler
Model AS-4090)
•
Staples/Flooring Cleats
•
Drill
Additional
Tools for Floating
Installation (Optional)
•
6 mil Polyethylene Vapor Barrier
•
Foam
Underlayment
• Floating Floor Glue (Goodfellow recommends the Goodfellow adhesive with a silicone base in a 474 ml bottle)
STEP BY STEP INSTALLATION INSTRUCTION
(Glued down application)
STEP *1 – Establish a starting line
- For best visual effect, it is recommended that flooring be installed parallel to the longest wall in the room.
- Using a chalk line the area between the wall and the chalk line becomes your working area for starting installation, and your last installation area for completing the installation.
STEP *2 – Spread the adhesive
- Apply the recommended adhesive with a trowel according to the manufacturer installation instructions (found on the adhesive pail) for the specific adhesive that is being used.
STEP *3 – Install the strips
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible. Pieces with flaws should be recut.
- Using the working area to install your flooring, line up the first strip with the tongue facing the wall, then press the strip into the adhesive and against the holding block.
- Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- Continue with the subsequent rows in the same manner.
- To avoid shifting or gaping of the strips during installation, use 3M blue tape to hold them together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may damage the finish.
- When you get to the final row you will likely find it necessary to rip-saw the strips to fit against the wall. Install using the pry bar and leave 1/4 -inch (6 mm) minimum expansion spaces.
STEP *4 – Install the transition pieces
• Install any transition piece
that may be needed, such as
stair nosing, and reducers. These
products are available prefinished to blend with your flooring. Please
install these first so that you can match the next board easier, color match on
mouldings cannot be guaranteed due to the natural characteristics of wood
flooring.
• Reinstall
your baseboards and/or
quarter round mouldings. Be certain to nail the mouldings into the
wall, not the floor.
• Always keep a few spare strips from your initial installation for possible repairs in a sealed carton and properly stored
• Wait 24 hours before moving furniture and appliances back into the area where flooring was installed.
STEP-BY-STEP
INSTALLATION INSTRUCTION
(Nailed/stapled down application)
Set-up and Use of Pneumatic Staplers and Nailers
-Read and follow the manufacturer’s instructions for complete set-up and operation of equipment.
- Make sure the adapter size for the pneumatic stapler or nailer matches the thickness of the flooring being installed and that the tool’s adapter seats properly in the tongue of the flooring.
- Pneumatic nailer: Air pressure should be adjusted adequately for each species of hardwood floor installed and checked regularly (always try it before using).
STEP *1 – Establish a starting line
• Using a chalk line, draw a guideline.
• It is very important to start straight and square.
STEP *2 – Install the
floor
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible (i.e. in a closet or under the refrigerator). Pieces with flaws should be recut.
- Use the longest, straightest strips available for the first row.
- Install the first row of flooring with groove facing starter wall.
- The first few rows must be nailed down by hand rather than with the nailing machine because of the vertical wall obstruction. Nailing interval should be at 6 inches. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of a least 6-inch (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- When the area is free from wall obstruction, you can repeat the installation using a pneumatic stapler.
- It is also likely that you may have to ripsaw the strips to fit the final row against the wall. Leave 1/4 - inch (6 mm) minimum expansion spaces.
- Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
STEP-BY-STEP INSTALLATION INSTRUCTION
(Floating
application)
STEP *1 – Install underlayments
- Install 6 mil Polyethylene vapor barrier over entire flooring surface. Overlap sheets of Polyethylene 16 inches and tape together creating airtight seal. Run the vapor barrier 1 to 1.5 inches up the walls and secure in place with tape.
- Using underlayment, roll out one roll at a time over the vapor barrier. There are many types of underlayments available today. The use of acoustical underlayment will improve the feel and sound transmission of your flooring.
STEP *2 – Preparing the starter rows
-It is very important that enough expansion gaps are kept between the flooring and all the walls. This is done by placing ¼ inch (6 mm) spacers every 8 inches apart around all vertical walls.
-Measure the width of the room – perpendicular to the direction you intend to install the flooring. The last row of flooring should be no less than 1 ½ inch wide. If it is less, you should rip-saw the starter row narrower. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
-Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
STEP *3 – Gluing the floor
-In a floating floor installation, the flooring is not glued or nailed to the underlayment but is glued in the board’s side and end grooves only.
-This is achieved by applying a bead of glue on the upper side of the groove along the entire length and on the end of each plank with silicone-based T & G glue. Turn the board upsidedown when applying the adhesive to achieve proper application, when the board is turned again forinstallation with the finish side up, this will allow the adhesive to flow down and give better coverage.Do not apply adhesive on the top of the tongue.
-Install the first row of flooring with groove facing starter wall. Use a tapping block and a mallet to gently push or tap the glued strips together until no gaps are seen and making sure that end joints are square.
-At the end wall use a pry bar, if needed, to pull the ends of the boards tight. Continue laying the floor on top of the underlayment, working left to right, tapping the strips tight together. Make sure to continue using ¼ inch spacers along the wall throughout the installation.
-To avoid shifting or gapping of the flooring during installation, lay perpendicular strips of 3M blue tape
- To hold the strips together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may cause damage to the finish.
-The last row will most likely require cutting to width, but it should be no less than 1 ½ inch wide. To do this, place a full row of strips on top of the last row installed. Insert a ¼ inch spacer against the wall, and using a full width strip, trace distance from wall onto final row. Cut strips for final row to designated width. Apply glue and pull into place with a pry bar.
-Allow floor to dry for a minimum of 12 hours before removing all the spacers and allowing foot traffic. Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
156 Comment(s)
I love how 가개통 provides an opportunity to explore different network plans without a big commitment.
I'm always excited to see what 주소월드 has in store.
강남카지노바 is the perfect place to kick back and enjoy some downtime.
링크모음 has made it so much easier to share resources with colleagues.
Basically to follow up on the up-date of this topic on your web site and wish to let you know simply how much I loved the time you took to generate this valuable post. Within the post, you really spoke of how to actually handle this matter with all ease. It would be my pleasure to collect some more ideas from your web page and come as much as offer other people what I learned from you. Many thanks for your usual terrific effort.
I have been reading out some of your stories and i can claim pretty nice stuff. I will surely bookmark your blog.
I used to be recommended this website by my cousin. I am no longer sure whether this put up is written by way of him as no one else realize such precise approximately my trouble. You are wonderful! Thank you!
I used to be recommended this website by my cousin. I am no longer sure whether this put up is written by way of him as no one else realize such precise approximately my trouble. You are wonderful! Thank you!
When I initially commented I clicked the -Notify me when new comments are added- checkbox and now each time a remark is added I get four emails with the same comment. Is there any manner you possibly can take away me from that service? Thanks!
Hi! I discovered your website accidentally today, but am really pleased that we did! Its not only entertaining, but in addition straightforward to make use of in contrast to lots that Ive viewed!
I’d have to talk to you here. Which isn’t something Which i do! I love to reading a post that should get people to think. Also, thank you for allowing me to comment!
Perhaps you should also a put a forum site on your blog to increase reader interaction.~.-.;
Perhaps you should also a put a forum site on your blog to increase reader interaction.~.-.;
ROFL, that thing is so funny. Im heading to share that.
over the internet,Inside moon of affection medication males prudent person has learned two of by far the most prone on the time for them to start, which is this most liked time of your sweetheart remorse, as well as his optimum free time to be with her.
I get here from google, but unfortunatelly I’m not found what I want. But this is a great article! THX!Kate Ruhn
Leave a Comment