Hardwood flooring is a beautiful and unique product of nature, which is characterized by distinctive variations in grain and colors. These natural variations in color and grain are not flaws but are a part of the natural beauty and uniqueness of hardwood flooring. These inherent variations should be expected and serve to enhance the natural beauty and enduring charm. Our floorings are manufactured in accordance with accepted industry standards, which permit a defect tolerance not to exceed 5%. The defects may be of a manufacturing or natural type.
Before we head to the installation... Things you need to know...
Job site Inspection& Acclimation
- This type of real wood flooring
can be installed below, equal or above
ground level. Do not install
in a bathroom.
- In a new construction, hardwood flooring should be one of the last items installed. All work involving water or moisture (plumbing, acoustical ceilings, dry wall taping, etc.) should be completed prior to wood flooring being installed. Heating and air systems should be fully operating maintaining a consistent room temperature at 16°C to 27°C (60-80° F) and a constant relative humidity of 40% to 55%.
- Flooring
should not be delivered until the building has been closed in and cement work,
plastering, painting and other materials are completely dry. Concrete and plaster should be cured
and at least 60 days old.
Check basements and under-floor crawl space to be sure that they are dry and
well ventilated to avoid damage caused by moisture.
- Handle
with care. Do not stand on ends. Store our flooring in a dry place being sure to provide
at least a four-inch air space under and around cartons.
- Do not store
directly on concrete or near outside
walls. Cartons should
be placed in the installation
area.
- The humidity level of the house must be maintained between 40 % and 55 % all year long. Wood is a living product which reacts to humidity level variations. During summer, where the humidity level is at its highest point, the wood has a natural expansion and absorbs the humidity, these variations must be dealt with adequate dehumidification. As for winter, when the heating system is working, the humidity level is lower. It is then recommended to use a humidifier to minimise the extreme effects of shrinkage.
Subfloor conditions
- Clean- Scraped or sanded, swept, free of wax, grease, paint, oil and other debris.
- Horizontal/ Flat- Maximum tolerance of 5mm over 3m(3/16'' over 10') or 3mm over 2m(1/8'' over6')
- Sand high areas or joints.
If the floor is glued,
fill the fill low areas with a latex additive
cement surfacing product with a minimum resistance to compression of 20
000 kPa.
- Concrete
Slabs (regardless of existing floor covering): Use an approved calibrated
concrete Moisture Meter as a preliminary measurement for moisture. Concrete
subfloors must be finished at least 30 days before performing a test. Acceptable verification methods: Perform a polyfilm
test. Tape down 2’ x 2’ polyfilm
squares (a clear garbage bag or plastic drop cloth will do) in several places
on the floor. Wait 24-48 hours, and then check for the appearance of condensation
on the inside of the bag or plastic for a darkening on the concrete subfloor.
Either occurrence signals the likely presence of excess moisture, which needs
other measures with the concrete moisture meter Tramex. The measure must not
climb over 4,5 on the superior graduation. The floor can be glued directly on
concrete with a compression resistance of at least 20 000 kPa (3 000 lb/in2).
- Wood Substrates: Test the moisture of the wood substrate using a calibrated moisture meter approved for testing wood moisture according to the meter manufacturer. The reading should not exceed 12%, or read more than a 4% difference than moisture content of products being installed.
Radiant Subfloor heating
NOTE: Always
make sure that the selected
product is recommended for this type of installation. Some species are not compatible and cannot be installed on this
type of subfloor; Jatoba, Maple, Kempas, Ironwood, Ipé, Asian Mahogany are some
species that are not suitable for Radiant heating. Please ensure that the
species you have chosen is suitable.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.
- Immediately start the radiant
heating system after the installation. The temperature of the finished surface cannot go over 27 °C (80
°F) at all times for the duration of the flooring’s life span.
- Radiant
heating systems usually procure a dry heat which can lower the ambient humidity
level. It could be necessary to use a humidifier to maintain a recommended level
of 40 % to 55 % and prevent
any damage to the floor.
- Flooring
installed on a radiant heating system must be glued at each end, in order to
reduce the shrinkage in length.
Apply a layer of recommended wood glue on the grooved
side before inserting the strip.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.
3924 Comment(s)
연말에는 꼭 건대 호빠에서 파티 해야겠어요.
오피스타’s calm and serene setting is ideal for relaxation
Thanks for taking the time to discuss that, I feel strongly about this and so really like getting to know more on this kind of field. Do you mind updating your blog post with additional insight? It should be really useful for all of us.
나트랑카지노는 베트남의 새로운 명소야
I must say, I think your really on point with this, I can’t say I am completely on the same page, but its not big of a deal .
Slots are a perfect blend of nostalgia and innovation. Old-school players will love the classic symbols and simple formats, while modern gamers will appreciate advanced features like cascading reels, stacked wilds, and 3D graphics. There's something for everyone in the world of slots.
Your blog has the same post as another author but i like your better.
What a rubbish. How can you refer to it a new web site. Customize the design, so it is going to be a bit better
Hello I am so delighted I located your blog, I really located you by mistake, while I was watching on google for something else, Anyways I am here now and could just like to say thank for a tremendous post and a all round entertaining website. Please do keep up the great work.
I had an amazing night out exploring 다낭 유흥 venues last weekend
Fantastical adventures on 블랙툰.
Among establishments that gave wage increases, the magnitude of increase was larger in 2022 compared with 2021. <a href="https://start.me/p/zpPDya" rel=nofollow">먹튀검증</a>
`Slot games appeal to a wide range of players because they offer both high volatility and low-risk options. High-volatility slots may pay out less frequently but offer the potential for massive wins, perfect for thrill-seekers. On the other hand, low-volatility slots offer consistent, smaller payouts that keep casual players engaged longer. This balance allows everyone to find a game that matches their style and risk tolerance.
I definitely enjoying every little bit of it. It is a great website and nice share. I want to thank you. Good job! You guys do a great blog, and have some great contents. Keep up the good work.
The review system on 오피가이드 is so user-friendly.
방문자들이 여기를 클릭을 쉽게 알아보고 바로 행동하더라고요.
Thanks for the blog post buddy! Keep them coming...
Thanks, that was a really cool read!
플레이 중인 유저들의 리뷰와 후기 또한 뉴헤븐카지노의 신뢰성을 높여줍니다. 실제 이용자들의 긍정적인 반응은 커뮤니티나 블로그, SNS에서도 쉽게 확인할 수 있으며, 지속적인 입소문은 이 카지노가 오랜 시간 동안 인기 있는 이유를 설명해줍니다.
온라인 카지노를 단순한 오락으로 생각하지 마세요. 아리아카지노는 프리미엄 브랜드로서의 철학을 가지고, 유저에게 최고 수준의 서비스를 제공합니다. 강력한 자본력을 바탕으로 안정적인 서버 환경과 보안 시스템을 구축하였으며, 이 덕분에 수년간 단 한 번의 먹튀 사례 없이 운영되고 있습니다. 특히 VIP 유저를 위한 전용 프로그램, 맞춤형 보너스, 빠른 출금 시스템 등은 아리아카지노만의 차별화된 경쟁력입니다. 신규가입자라면 지금이 기회입니다. 혜택이 풍성한 이벤트와 함께 고급스러운 카지노의 세계를 경험해보세요.
Leave a Comment