Hardwood flooring is a beautiful and unique product of nature, which is characterized by distinctive variations in grain and colors. These natural variations in color and grain are not flaws but are a part of the natural beauty and uniqueness of hardwood flooring. These inherent variations should be expected and serve to enhance the natural beauty and enduring charm. Our floorings are manufactured in accordance with accepted industry standards, which permit a defect tolerance not to exceed 5%. The defects may be of a manufacturing or natural type.
Before we head to the installation... Things you need to know...
Job site Inspection& Acclimation
- This type of real wood flooring
can be installed below, equal or above
ground level. Do not install
in a bathroom.
- In a new construction, hardwood flooring should be one of the last items installed. All work involving water or moisture (plumbing, acoustical ceilings, dry wall taping, etc.) should be completed prior to wood flooring being installed. Heating and air systems should be fully operating maintaining a consistent room temperature at 16°C to 27°C (60-80° F) and a constant relative humidity of 40% to 55%.
- Flooring
should not be delivered until the building has been closed in and cement work,
plastering, painting and other materials are completely dry. Concrete and plaster should be cured
and at least 60 days old.
Check basements and under-floor crawl space to be sure that they are dry and
well ventilated to avoid damage caused by moisture.
- Handle
with care. Do not stand on ends. Store our flooring in a dry place being sure to provide
at least a four-inch air space under and around cartons.
- Do not store
directly on concrete or near outside
walls. Cartons should
be placed in the installation
area.
- The humidity level of the house must be maintained between 40 % and 55 % all year long. Wood is a living product which reacts to humidity level variations. During summer, where the humidity level is at its highest point, the wood has a natural expansion and absorbs the humidity, these variations must be dealt with adequate dehumidification. As for winter, when the heating system is working, the humidity level is lower. It is then recommended to use a humidifier to minimise the extreme effects of shrinkage.
Subfloor conditions
- Clean- Scraped or sanded, swept, free of wax, grease, paint, oil and other debris.
- Horizontal/ Flat- Maximum tolerance of 5mm over 3m(3/16'' over 10') or 3mm over 2m(1/8'' over6')
- Sand high areas or joints.
If the floor is glued,
fill the fill low areas with a latex additive
cement surfacing product with a minimum resistance to compression of 20
000 kPa.
- Concrete
Slabs (regardless of existing floor covering): Use an approved calibrated
concrete Moisture Meter as a preliminary measurement for moisture. Concrete
subfloors must be finished at least 30 days before performing a test. Acceptable verification methods: Perform a polyfilm
test. Tape down 2’ x 2’ polyfilm
squares (a clear garbage bag or plastic drop cloth will do) in several places
on the floor. Wait 24-48 hours, and then check for the appearance of condensation
on the inside of the bag or plastic for a darkening on the concrete subfloor.
Either occurrence signals the likely presence of excess moisture, which needs
other measures with the concrete moisture meter Tramex. The measure must not
climb over 4,5 on the superior graduation. The floor can be glued directly on
concrete with a compression resistance of at least 20 000 kPa (3 000 lb/in2).
- Wood Substrates: Test the moisture of the wood substrate using a calibrated moisture meter approved for testing wood moisture according to the meter manufacturer. The reading should not exceed 12%, or read more than a 4% difference than moisture content of products being installed.
Radiant Subfloor heating
NOTE: Always
make sure that the selected
product is recommended for this type of installation. Some species are not compatible and cannot be installed on this
type of subfloor; Jatoba, Maple, Kempas, Ironwood, Ipé, Asian Mahogany are some
species that are not suitable for Radiant heating. Please ensure that the
species you have chosen is suitable.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.
- Immediately start the radiant
heating system after the installation. The temperature of the finished surface cannot go over 27 °C (80
°F) at all times for the duration of the flooring’s life span.
- Radiant
heating systems usually procure a dry heat which can lower the ambient humidity
level. It could be necessary to use a humidifier to maintain a recommended level
of 40 % to 55 % and prevent
any damage to the floor.
- Flooring
installed on a radiant heating system must be glued at each end, in order to
reduce the shrinkage in length.
Apply a layer of recommended wood glue on the grooved
side before inserting the strip.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.



9666 Comment(s)
Very informative article.Really looking forward to read more. Fantastic.
Looking forward to reading more. Great blog post.Thanks Again. Will read on...
Nature Tourism Lovers
Nature Tourism Lovers
Latest Viral News from Indonesia
Latest Viral News from Indonesia
Welcome to Mahadev Book, the online betting game-changer of all time. Looking for a secure, fast, and verified Mahadev Book ID? You're in the right place. Visit Now: https://lordsexchangee.com/
Sistem yang stabil memastikan pengalaman hiburan digital berjalan lancar.
Navigasi intuitif mendukung pengalaman hiburan digital yang menyenangkan.
Really enjoyed this article post. Fantastic.
writing is my passion that is why it is easy for me to do article writing in less than a hour or so’
I admire the dedication you bring to teamwork.
Terima kasih artikelnya, sangat informatif. Saya sedang mencari referensi platform yang aksesnya cepat dan aman, dan kebetulan saya sedang mencoba layanan dari Pahala4d. Halaman registrasinya cukup mudah diakses di sini: https://pahala4d.uk.com/register
Artikel ini sangat membantu, terutama bagian pembahasan analisanya. Saya juga sedang mengikuti perkembangan platform Gwinbola dan menemukan beberapa poin menarik. Untuk yang ingin cek langsung bisa lihat di: https://ruhrd.com
Erek erek Toto Macau menjadi panduan favorit pemain togel untuk menemukan angka hoki berdasarkan tafsir mimpi dan kode alam. Melalui bandar toto Macau terpercaya, pemain bisa menikmati pasaran Toto Macau resmi dengan result harian yang valid dan transparan. Sistem modern, akses cepat, serta data keluaran lengkap membuat permainan lebih terarah dan strategis. Dengan dukungan layanan profesional dan keamanan terjamin, bandar toto ini menghadirkan pengalaman bermain togel online yang stabil, nyaman, dan penuh peluang menang.
오피아트는 대전, 세종, 충청권 전역의 인기 매니저 프로필을 순위별로 정리하여 사용자들이 한눈에 비교하고 선택할 수 있도록 돕는 플랫폼입니다.
Thanks for the post. I discovered 포항출장마사지 while researching alternative wellness options.
Good read. I’ve seen more discussions around 안산출장마사지, so this was timely.
"스카이가라오케: 깔끔한 분위기와 좋은 음향으로 즐거운 시간을 보낼 수 있는 노래 공간입니다."
The CricAdda feels very easy to use, which is something I really value. I don’t want to spend too much time figuring out how to access my account, and this page keeps things simple. It loads quickly and works well even on slower connections. The design is neat and not cluttered, so it’s comfortable to look at. I also like that it behaves the same way on mobile and desktop. That consistency makes it more convenient to use regularly. So far, it has been smooth and dependable every time.
Leave a Comment