Things you may want to know
02 Dec
20 Comment(s)
297618 View(s)
Hardwood flooring is a beautiful and unique product of nature, which is characterized by distinctive variations in grain and colors. These natural variations in color and grain are not flaws but are a part of the natural beauty and uniqueness of hardwood flooring. These inherent variations should be expected and serve to enhance the natural beauty and enduring charm. Our floorings are manufactured in accordance with accepted industry standards, which permit a defect tolerance not to exceed 5%. The defects may be of a manufacturing or natural type.
Before we head to the installation... Things you need to know...
Job site Inspection& Acclimation
- This type of real wood flooring
can be installed below, equal or above
ground level. Do not install
in a bathroom.
- In a new construction, hardwood flooring should be one of the last items installed. All work involving water or moisture (plumbing, acoustical ceilings, dry wall taping, etc.) should be completed prior to wood flooring being installed. Heating and air systems should be fully operating maintaining a consistent room temperature at 16°C to 27°C (60-80° F) and a constant relative humidity of 40% to 55%.
- Flooring
should not be delivered until the building has been closed in and cement work,
plastering, painting and other materials are completely dry. Concrete and plaster should be cured
and at least 60 days old.
Check basements and under-floor crawl space to be sure that they are dry and
well ventilated to avoid damage caused by moisture.
- Handle
with care. Do not stand on ends. Store our flooring in a dry place being sure to provide
at least a four-inch air space under and around cartons.
- Do not store
directly on concrete or near outside
walls. Cartons should
be placed in the installation
area.
- The humidity level of the house must be maintained between 40 % and 55 % all year long. Wood is a living product which reacts to humidity level variations. During summer, where the humidity level is at its highest point, the wood has a natural expansion and absorbs the humidity, these variations must be dealt with adequate dehumidification. As for winter, when the heating system is working, the humidity level is lower. It is then recommended to use a humidifier to minimise the extreme effects of shrinkage.
Subfloor conditions
- Clean- Scraped or sanded, swept, free of wax, grease, paint, oil and other debris.
- Horizontal/ Flat- Maximum tolerance of 5mm over 3m(3/16'' over 10') or 3mm over 2m(1/8'' over6')
- Sand high areas or joints.
If the floor is glued,
fill the fill low areas with a latex additive
cement surfacing product with a minimum resistance to compression of 20
000 kPa.
- Concrete
Slabs (regardless of existing floor covering): Use an approved calibrated
concrete Moisture Meter as a preliminary measurement for moisture. Concrete
subfloors must be finished at least 30 days before performing a test. Acceptable verification methods: Perform a polyfilm
test. Tape down 2’ x 2’ polyfilm
squares (a clear garbage bag or plastic drop cloth will do) in several places
on the floor. Wait 24-48 hours, and then check for the appearance of condensation
on the inside of the bag or plastic for a darkening on the concrete subfloor.
Either occurrence signals the likely presence of excess moisture, which needs
other measures with the concrete moisture meter Tramex. The measure must not
climb over 4,5 on the superior graduation. The floor can be glued directly on
concrete with a compression resistance of at least 20 000 kPa (3 000 lb/in2).
- Wood Substrates: Test the moisture of the wood substrate using a calibrated moisture meter approved for testing wood moisture according to the meter manufacturer. The reading should not exceed 12%, or read more than a 4% difference than moisture content of products being installed.
Radiant Subfloor heating
NOTE: Always
make sure that the selected
product is recommended for this type of installation. Some species are not compatible and cannot be installed on this
type of subfloor; Jatoba, Maple, Kempas, Ironwood, Ipé, Asian Mahogany are some
species that are not suitable for Radiant heating. Please ensure that the
species you have chosen is suitable.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.
- Immediately start the radiant
heating system after the installation. The temperature of the finished surface cannot go over 27 °C (80
°F) at all times for the duration of the flooring’s life span.
- Radiant
heating systems usually procure a dry heat which can lower the ambient humidity
level. It could be necessary to use a humidifier to maintain a recommended level
of 40 % to 55 % and prevent
any damage to the floor.
- Flooring
installed on a radiant heating system must be glued at each end, in order to
reduce the shrinkage in length.
Apply a layer of recommended wood glue on the grooved
side before inserting the strip.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.



11493 Comment(s)
Thanks for sharing this insight. Thank you Keep up the good work!
This is exactly what I was looking for. Thank you I will definitely try this next time.
I couldn't agree more with your analysis. Thank you Keep up the good work!
One thing I genuinely appreciate about laser247 Club is how user-friendly the platform is. Even someone who isn’t very tech-savvy can easily understand how to get started. The sports experience feels interactive, and the loading speed is impressive. I also liked how after each game, the app provides clear feedback, making it easier to learn and improve. It’s not just about playing—it’s about understanding the game better. Technology here is used in a smart way to keep users engaged without overwhelming them.
I appreciate the detailed explanation. Thank you Thanks for the valuable information.
A big thank you for your blog.Really thank you! Great.
I agree with your point. Home wellness trends like 대전출장마사지 are growing quickly.
Very informative post. I’m researching 순천출장마사지 and found some helpful resources.
I totally agree with your point about travel fatigue. Thank you Keep up the good work!
I appreciate the detailed explanation. Thank you I've bookmarked this for future reference.
This is a game-changer for me. Thank you I will definitely try this next time.
This is exactly what I was looking for. Thank you This is a must-read for anyone in the field.
Lovely post. I wanted to let you know that I enjoyed reading your blog entries when I recently came on your site. Ultimately, I will undoubtedly subscribe to your feed, and I hope to see more posts from you soon!
Great article! I found it very informative. Thank you This has given me a new perspective.
vibet88 is an emerging online platform that offers users a dynamic and engaging digital experience. Known for its modern interface and user-friendly design, Vibet88 provides easy access to a variety of online services, making it popular among users looking for convenience and entertainment in one place.
Thank you so much for sharing this great blog.Very inspiring and helpful too.Hope you continue to share more of your ideas.I will definitely love to read.
Great article! I found it very informative. Thank you This has given me a new perspective.
Great write-up, I am a big believer in commenting on blogs to inform the blog writers know that they’ve added something worthwhile to the world wide web!..
This is a game-changer for me. Thank you I've bookmarked this for future reference.
This resonates with my own experiences. Thank you I will definitely try this next time.
Leave a Comment