Hardwood flooring is a beautiful and unique product of nature, which is characterized by distinctive variations in grain and colors. These natural variations in color and grain are not flaws but are a part of the natural beauty and uniqueness of hardwood flooring. These inherent variations should be expected and serve to enhance the natural beauty and enduring charm. Our floorings are manufactured in accordance with accepted industry standards, which permit a defect tolerance not to exceed 5%. The defects may be of a manufacturing or natural type.
Before we head to the installation... Things you need to know...
Job site Inspection& Acclimation
- This type of real wood flooring
can be installed below, equal or above
ground level. Do not install
in a bathroom.
- In a new construction, hardwood flooring should be one of the last items installed. All work involving water or moisture (plumbing, acoustical ceilings, dry wall taping, etc.) should be completed prior to wood flooring being installed. Heating and air systems should be fully operating maintaining a consistent room temperature at 16°C to 27°C (60-80° F) and a constant relative humidity of 40% to 55%.
- Flooring
should not be delivered until the building has been closed in and cement work,
plastering, painting and other materials are completely dry. Concrete and plaster should be cured
and at least 60 days old.
Check basements and under-floor crawl space to be sure that they are dry and
well ventilated to avoid damage caused by moisture.
- Handle
with care. Do not stand on ends. Store our flooring in a dry place being sure to provide
at least a four-inch air space under and around cartons.
- Do not store
directly on concrete or near outside
walls. Cartons should
be placed in the installation
area.
- The humidity level of the house must be maintained between 40 % and 55 % all year long. Wood is a living product which reacts to humidity level variations. During summer, where the humidity level is at its highest point, the wood has a natural expansion and absorbs the humidity, these variations must be dealt with adequate dehumidification. As for winter, when the heating system is working, the humidity level is lower. It is then recommended to use a humidifier to minimise the extreme effects of shrinkage.
Subfloor conditions
- Clean- Scraped or sanded, swept, free of wax, grease, paint, oil and other debris.
- Horizontal/ Flat- Maximum tolerance of 5mm over 3m(3/16'' over 10') or 3mm over 2m(1/8'' over6')
- Sand high areas or joints.
If the floor is glued,
fill the fill low areas with a latex additive
cement surfacing product with a minimum resistance to compression of 20
000 kPa.
- Concrete
Slabs (regardless of existing floor covering): Use an approved calibrated
concrete Moisture Meter as a preliminary measurement for moisture. Concrete
subfloors must be finished at least 30 days before performing a test. Acceptable verification methods: Perform a polyfilm
test. Tape down 2’ x 2’ polyfilm
squares (a clear garbage bag or plastic drop cloth will do) in several places
on the floor. Wait 24-48 hours, and then check for the appearance of condensation
on the inside of the bag or plastic for a darkening on the concrete subfloor.
Either occurrence signals the likely presence of excess moisture, which needs
other measures with the concrete moisture meter Tramex. The measure must not
climb over 4,5 on the superior graduation. The floor can be glued directly on
concrete with a compression resistance of at least 20 000 kPa (3 000 lb/in2).
- Wood Substrates: Test the moisture of the wood substrate using a calibrated moisture meter approved for testing wood moisture according to the meter manufacturer. The reading should not exceed 12%, or read more than a 4% difference than moisture content of products being installed.
Radiant Subfloor heating
NOTE: Always
make sure that the selected
product is recommended for this type of installation. Some species are not compatible and cannot be installed on this
type of subfloor; Jatoba, Maple, Kempas, Ironwood, Ipé, Asian Mahogany are some
species that are not suitable for Radiant heating. Please ensure that the
species you have chosen is suitable.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.
- Immediately start the radiant
heating system after the installation. The temperature of the finished surface cannot go over 27 °C (80
°F) at all times for the duration of the flooring’s life span.
- Radiant
heating systems usually procure a dry heat which can lower the ambient humidity
level. It could be necessary to use a humidifier to maintain a recommended level
of 40 % to 55 % and prevent
any damage to the floor.
- Flooring
installed on a radiant heating system must be glued at each end, in order to
reduce the shrinkage in length.
Apply a layer of recommended wood glue on the grooved
side before inserting the strip.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.



13310 Comment(s)
소액결제현금화 전문 상담! 휴대폰소액결제현금화, 정보이용료현금화, 콘텐츠이용료현금화 업계 최저 수수료로 3분 내 즉시 입금. 24시간 365일 안전한 정식 사업자.
Great, thanks for sharing this blog.Much thanks again. Really Cool.
Great, thanks for sharing this blog.Much thanks again. Really Cool.
Professional painting services in Dubai, Ajman, and Sharjah offering high-quality interior and exterior finishes for homes, offices, and commercial spaces. Our expert painters deliver smooth, durable results using premium materials at affordable prices.
소액 결제(휴대폰 소액결제)는 온라인 가맹점에서 유료 콘텐츠나 물품 구매 시, 결제 대금을 [휴대폰 번호 인증을 통해 다음 달 휴대폰 요금에 합산하여 청구하는 결제 방식]입니다.
This is a smart blog. I mean it. You have so much knowledge about this issue, and so much passion. You also know how to make people rally behind it, obviously from the responses.
A big thank you for your article post.Much thanks again. Will read on...
소액결제현금화란 바로 이 휴대폰 소액결제에 주어진 한도를 이용해 온라인에서 물품이나 모바일 상품권 등을 구매한 뒤, 일정 수수료를 제외하고 다시 판매하여 현금을
안산출장마사지 can be a good solution for convenience, but not all providers offer the same level of service. This guide explains 안산출장마사지 differences and key points to consider.
Very informative article.Really thank you! Cool.
Looking forward to reading more. Great blog.Thanks Again. Really Cool.
Thank you ever so for you article post.Much thanks again. Great.
Thank you ever so for you article post.Much thanks again. Great.
This is actually exciting, You’re an enormously knowledgeable blogger. I have enrolled with your feed and also anticipate witnessing the useful write-ups. At the same time, I’ve shared your site in our social networks.
Remarkable article, it is particularly useful! I quietly began in this, and I'm becoming more acquainted with it better! Delights, keep doing more and extra impressive!
Remarkable article, it is particularly useful! I quietly began in this, and I'm becoming more acquainted with it better! Delights, keep doing more and extra impressive!
Um dos grandes destaques da 79c bet games online é a variedade de jogos. A plataforma oferece máquinas caça-níqueis modernas, jogos de mesa clássicos como roleta e blackjack, além de opções com gráficos avançados. Essa diversidade garante entretenimento para diferentes estilos de jogadores.
Real wonderful info can be found on web blog .
I also think thus, perfectly written post! .
If you're looking for high-class Murree escorts, these professionals offer an experience that combines sophistication with charm. Their delightful company will make your evening truly exceptional.
Leave a Comment