Things you may want to know
02 Dec
14 Comment(s)
127696 View(s)
Hardwood flooring is a beautiful and unique product of nature, which is characterized by distinctive variations in grain and colors. These natural variations in color and grain are not flaws but are a part of the natural beauty and uniqueness of hardwood flooring. These inherent variations should be expected and serve to enhance the natural beauty and enduring charm. Our floorings are manufactured in accordance with accepted industry standards, which permit a defect tolerance not to exceed 5%. The defects may be of a manufacturing or natural type.
Before we head to the installation... Things you need to know...
Job site Inspection& Acclimation
- This type of real wood flooring
can be installed below, equal or above
ground level. Do not install
in a bathroom.
- In a new construction, hardwood flooring should be one of the last items installed. All work involving water or moisture (plumbing, acoustical ceilings, dry wall taping, etc.) should be completed prior to wood flooring being installed. Heating and air systems should be fully operating maintaining a consistent room temperature at 16°C to 27°C (60-80° F) and a constant relative humidity of 40% to 55%.
- Flooring
should not be delivered until the building has been closed in and cement work,
plastering, painting and other materials are completely dry. Concrete and plaster should be cured
and at least 60 days old.
Check basements and under-floor crawl space to be sure that they are dry and
well ventilated to avoid damage caused by moisture.
- Handle
with care. Do not stand on ends. Store our flooring in a dry place being sure to provide
at least a four-inch air space under and around cartons.
- Do not store
directly on concrete or near outside
walls. Cartons should
be placed in the installation
area.
- The humidity level of the house must be maintained between 40 % and 55 % all year long. Wood is a living product which reacts to humidity level variations. During summer, where the humidity level is at its highest point, the wood has a natural expansion and absorbs the humidity, these variations must be dealt with adequate dehumidification. As for winter, when the heating system is working, the humidity level is lower. It is then recommended to use a humidifier to minimise the extreme effects of shrinkage.
Subfloor conditions
- Clean- Scraped or sanded, swept, free of wax, grease, paint, oil and other debris.
- Horizontal/ Flat- Maximum tolerance of 5mm over 3m(3/16'' over 10') or 3mm over 2m(1/8'' over6')
- Sand high areas or joints.
If the floor is glued,
fill the fill low areas with a latex additive
cement surfacing product with a minimum resistance to compression of 20
000 kPa.
- Concrete
Slabs (regardless of existing floor covering): Use an approved calibrated
concrete Moisture Meter as a preliminary measurement for moisture. Concrete
subfloors must be finished at least 30 days before performing a test. Acceptable verification methods: Perform a polyfilm
test. Tape down 2’ x 2’ polyfilm
squares (a clear garbage bag or plastic drop cloth will do) in several places
on the floor. Wait 24-48 hours, and then check for the appearance of condensation
on the inside of the bag or plastic for a darkening on the concrete subfloor.
Either occurrence signals the likely presence of excess moisture, which needs
other measures with the concrete moisture meter Tramex. The measure must not
climb over 4,5 on the superior graduation. The floor can be glued directly on
concrete with a compression resistance of at least 20 000 kPa (3 000 lb/in2).
- Wood Substrates: Test the moisture of the wood substrate using a calibrated moisture meter approved for testing wood moisture according to the meter manufacturer. The reading should not exceed 12%, or read more than a 4% difference than moisture content of products being installed.
Radiant Subfloor heating
NOTE: Always
make sure that the selected
product is recommended for this type of installation. Some species are not compatible and cannot be installed on this
type of subfloor; Jatoba, Maple, Kempas, Ironwood, Ipé, Asian Mahogany are some
species that are not suitable for Radiant heating. Please ensure that the
species you have chosen is suitable.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.
- Immediately start the radiant
heating system after the installation. The temperature of the finished surface cannot go over 27 °C (80
°F) at all times for the duration of the flooring’s life span.
- Radiant
heating systems usually procure a dry heat which can lower the ambient humidity
level. It could be necessary to use a humidifier to maintain a recommended level
of 40 % to 55 % and prevent
any damage to the floor.
- Flooring
installed on a radiant heating system must be glued at each end, in order to
reduce the shrinkage in length.
Apply a layer of recommended wood glue on the grooved
side before inserting the strip.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.



6054 Comment(s)
Thanks for a marvelous posting! I actually enjoyed reading it, you will be a great author. I will make certain to bookmark your blog and will eventually come back down the road. I want to encourage you to continue your great job, have a nice evening!
Thank you for your motivation in all circumstances.
Woah! I'm really digging the template/theme of this website. It's simple, yet effective. A lot of times it's very hard to get that "perfect balance" between superb usability and visual appearance. I must say that you've done a great job with this. Also, the blog loads super fast for me on Firefox. Superb Blog!
Hi, after reading this amazing article i am too delighted to share my experience here with colleagues.
Way cool! Some extremely valid points! I appreciate you penning this write-up and the rest of the website is also really good.
you use a wonderful blog here! want to make some invite posts on my own blog?
강릉출장마사지 - 강릉 전역에 24시간 여성 전문 마사지사가 찾아가는 출장 홈타이 서비스! 아로마, 스포츠, 커플 마사지로 피로와 스트레스를 합리적 가격에 풀어
GOod articles post. I have bookmarked this site. Keep up the good work
강남 달토 is the perfect spot for a spontaneous karaoke night.
Hi there to all, since I am truly keen of reading this web site's post to be updated on a regular basis. It consists of nice data.
You make so many great points here that I read your article a couple of times. Your views are in accordance with my own for the most part. This is great content for your readers.
Main aman, gampang menang, dan anti delay? Semua bisa lo dapetin di asialive88 login link alternatif — situs resmi dengan sistem fair play.
Only strive to mention one's content can be as incredible. This clarity with your post is superb! Thanks a lot, hundreds of along with you should go on the pleasurable get the job done.
alfacar.net delivers expert coverage of cars, maintenance, and innovations. It’s the ideal platform for enthusiasts who seek clarity, trust, and inspiration in every aspect of modern automotive living.
Leave a Comment