Things you may want to know
02 Dec
20 Comment(s)
195401 View(s)
Hardwood flooring is a beautiful and unique product of nature, which is characterized by distinctive variations in grain and colors. These natural variations in color and grain are not flaws but are a part of the natural beauty and uniqueness of hardwood flooring. These inherent variations should be expected and serve to enhance the natural beauty and enduring charm. Our floorings are manufactured in accordance with accepted industry standards, which permit a defect tolerance not to exceed 5%. The defects may be of a manufacturing or natural type.
Before we head to the installation... Things you need to know...
Job site Inspection& Acclimation
- This type of real wood flooring
can be installed below, equal or above
ground level. Do not install
in a bathroom.
- In a new construction, hardwood flooring should be one of the last items installed. All work involving water or moisture (plumbing, acoustical ceilings, dry wall taping, etc.) should be completed prior to wood flooring being installed. Heating and air systems should be fully operating maintaining a consistent room temperature at 16°C to 27°C (60-80° F) and a constant relative humidity of 40% to 55%.
- Flooring
should not be delivered until the building has been closed in and cement work,
plastering, painting and other materials are completely dry. Concrete and plaster should be cured
and at least 60 days old.
Check basements and under-floor crawl space to be sure that they are dry and
well ventilated to avoid damage caused by moisture.
- Handle
with care. Do not stand on ends. Store our flooring in a dry place being sure to provide
at least a four-inch air space under and around cartons.
- Do not store
directly on concrete or near outside
walls. Cartons should
be placed in the installation
area.
- The humidity level of the house must be maintained between 40 % and 55 % all year long. Wood is a living product which reacts to humidity level variations. During summer, where the humidity level is at its highest point, the wood has a natural expansion and absorbs the humidity, these variations must be dealt with adequate dehumidification. As for winter, when the heating system is working, the humidity level is lower. It is then recommended to use a humidifier to minimise the extreme effects of shrinkage.
Subfloor conditions
- Clean- Scraped or sanded, swept, free of wax, grease, paint, oil and other debris.
- Horizontal/ Flat- Maximum tolerance of 5mm over 3m(3/16'' over 10') or 3mm over 2m(1/8'' over6')
- Sand high areas or joints.
If the floor is glued,
fill the fill low areas with a latex additive
cement surfacing product with a minimum resistance to compression of 20
000 kPa.
- Concrete
Slabs (regardless of existing floor covering): Use an approved calibrated
concrete Moisture Meter as a preliminary measurement for moisture. Concrete
subfloors must be finished at least 30 days before performing a test. Acceptable verification methods: Perform a polyfilm
test. Tape down 2’ x 2’ polyfilm
squares (a clear garbage bag or plastic drop cloth will do) in several places
on the floor. Wait 24-48 hours, and then check for the appearance of condensation
on the inside of the bag or plastic for a darkening on the concrete subfloor.
Either occurrence signals the likely presence of excess moisture, which needs
other measures with the concrete moisture meter Tramex. The measure must not
climb over 4,5 on the superior graduation. The floor can be glued directly on
concrete with a compression resistance of at least 20 000 kPa (3 000 lb/in2).
- Wood Substrates: Test the moisture of the wood substrate using a calibrated moisture meter approved for testing wood moisture according to the meter manufacturer. The reading should not exceed 12%, or read more than a 4% difference than moisture content of products being installed.
Radiant Subfloor heating
NOTE: Always
make sure that the selected
product is recommended for this type of installation. Some species are not compatible and cannot be installed on this
type of subfloor; Jatoba, Maple, Kempas, Ironwood, Ipé, Asian Mahogany are some
species that are not suitable for Radiant heating. Please ensure that the
species you have chosen is suitable.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.
- Immediately start the radiant
heating system after the installation. The temperature of the finished surface cannot go over 27 °C (80
°F) at all times for the duration of the flooring’s life span.
- Radiant
heating systems usually procure a dry heat which can lower the ambient humidity
level. It could be necessary to use a humidifier to maintain a recommended level
of 40 % to 55 % and prevent
any damage to the floor.
- Flooring
installed on a radiant heating system must be glued at each end, in order to
reduce the shrinkage in length.
Apply a layer of recommended wood glue on the grooved
side before inserting the strip.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.



8777 Comment(s)
I appreciate the focus on real sleep comfort, not just brand names. This makes the article practical. It’s about solving problems, not selling products. Very refreshing.
Thanks for pointing out how 카드깡 affects credit history.
Nice to meet you! We are a online retailer since 1988. Welcome to Elivera 1988-2025. EliveraGroup sells online natural cosmetics, beauty products, food supplements. We connect people with products and services in new and unexpected ways. The company ELIVERAGroup, is a Retailer, which operates in the Cosmetics industry. ELIVERA was established in 1988. ELIVERA LTD was established in 2007. The first project was in 1988. It was carried out in trade with Russia, Belarus, Ukraine, Belgium, Hungary, Poland, Lithuania, Latvia and Estonia.
광명출장마사지(광명출장안마) 24시 연중무휴 운영! 아로마·스포츠·발마사지 등 광명 홈타이 출장 서비스로, 광명시 전지역 남녀노소 누구나 자택이나 호텔 등 원하는
수원출장마사지 – 수원 전역 호텔・자택에서 아로마마사지, 스포츠마사지, 스웨디시를 전문 테라피스트에게 받아보세요. 고품격 홈케어 힐링과 맞춤 서비스, 철저한 위생 관리로 남녀 누구나 안심하고 이용할 수 있습니다
수원출장마사지 – 수원 전역 호텔・자택에서 아로마마사지, 스포츠마사지, 스웨디시를 전문 테라피스트에게 받아보세요. 고품격 홈케어 힐링과 맞춤 서비스, 철저한 위생 관리로 남녀 누구나 안심하고 이용할 수 있습니다
수원출장마사지 – 수원 전역 호텔・자택에서 아로마마사지, 스포츠마사지, 스웨디시를 전문 테라피스트에게 받아보세요. 고품격 홈케어 힐링과 맞춤 서비스, 철저한 위생 관리로 남녀 누구나 안심하고 이용할 수 있습니다
MarkasZeus dikenal sebagai agen bola tepercaya yang fokus pada kepuasan pemain
Fitur Mix Parlay memberikan peluang keuntungan lebih besar melalui kombinasi pertandingan.
Merely a smiling visitant here to share the love (:, btw outstanding style.
Im grateful for the blog post.Thanks Again. Keep writing.
Hello there! Do you use Twitter? I'd like to follow you if that would be ok. I'm undoubtedly enjoying your blog and look forward to new updates.
Wow, awesome blog layout! How long have you been blogging for? you make blogging look easy. The overall look of your website is fantastic, let alone the content!
광명출장마사지(광명출장안마) 24시 연중무휴 운영! 아로마·스포츠·발마사지 등 광명 홈타이 출장 서비스로, 광명시 전지역 남녀노소 누구나 자택이나 호텔 등 원하는
광명출장마사지(광명출장안마) 24시 연중무휴 운영! 아로마·스포츠·발마사지 등 광명 홈타이 출장 서비스로, 광명시 전지역 남녀노소 누구나 자택이나 호텔 등 원하는
평택출장마사지/평택출장안마/평택출장 모두 방문형 마사지 관리로 이해하시면 됩니다. 고객님이 계신곳으로 직접 방문하여 다양한 마사지 프로그램(타이/아로마/스웨디시/홈타이)를 제공합니다.
SLOT GACOR
SLOT GACOR
원주출장마사지 서비스는 원주광역시 전역에서 편안하게 전문 마사지를 받을 수 있는 출장 홈타이 서비스입니다. 고객님이 계신 곳으로 여성 전문 테라피스트가 직접
폰테크란 무엇인가? 폰테크는 휴대폰을 통해 현금을 마련하는 독특한 재테크 방법입니다. 좀 더 자세히 말해, 새로운 휴대폰을 개통한 뒤 그 휴대폰을 사용하지 않고
Leave a Comment