Hardwood flooring is a beautiful and unique product of nature, which is characterized by distinctive variations in grain and colors. These natural variations in color and grain are not flaws but are a part of the natural beauty and uniqueness of hardwood flooring. These inherent variations should be expected and serve to enhance the natural beauty and enduring charm. Our floorings are manufactured in accordance with accepted industry standards, which permit a defect tolerance not to exceed 5%. The defects may be of a manufacturing or natural type.
Before we head to the installation... Things you need to know...
Job site Inspection& Acclimation
- This type of real wood flooring
can be installed below, equal or above
ground level. Do not install
in a bathroom.
- In a new construction, hardwood flooring should be one of the last items installed. All work involving water or moisture (plumbing, acoustical ceilings, dry wall taping, etc.) should be completed prior to wood flooring being installed. Heating and air systems should be fully operating maintaining a consistent room temperature at 16°C to 27°C (60-80° F) and a constant relative humidity of 40% to 55%.
- Flooring
should not be delivered until the building has been closed in and cement work,
plastering, painting and other materials are completely dry. Concrete and plaster should be cured
and at least 60 days old.
Check basements and under-floor crawl space to be sure that they are dry and
well ventilated to avoid damage caused by moisture.
- Handle
with care. Do not stand on ends. Store our flooring in a dry place being sure to provide
at least a four-inch air space under and around cartons.
- Do not store
directly on concrete or near outside
walls. Cartons should
be placed in the installation
area.
- The humidity level of the house must be maintained between 40 % and 55 % all year long. Wood is a living product which reacts to humidity level variations. During summer, where the humidity level is at its highest point, the wood has a natural expansion and absorbs the humidity, these variations must be dealt with adequate dehumidification. As for winter, when the heating system is working, the humidity level is lower. It is then recommended to use a humidifier to minimise the extreme effects of shrinkage.
Subfloor conditions
- Clean- Scraped or sanded, swept, free of wax, grease, paint, oil and other debris.
- Horizontal/ Flat- Maximum tolerance of 5mm over 3m(3/16'' over 10') or 3mm over 2m(1/8'' over6')
- Sand high areas or joints.
If the floor is glued,
fill the fill low areas with a latex additive
cement surfacing product with a minimum resistance to compression of 20
000 kPa.
- Concrete
Slabs (regardless of existing floor covering): Use an approved calibrated
concrete Moisture Meter as a preliminary measurement for moisture. Concrete
subfloors must be finished at least 30 days before performing a test. Acceptable verification methods: Perform a polyfilm
test. Tape down 2’ x 2’ polyfilm
squares (a clear garbage bag or plastic drop cloth will do) in several places
on the floor. Wait 24-48 hours, and then check for the appearance of condensation
on the inside of the bag or plastic for a darkening on the concrete subfloor.
Either occurrence signals the likely presence of excess moisture, which needs
other measures with the concrete moisture meter Tramex. The measure must not
climb over 4,5 on the superior graduation. The floor can be glued directly on
concrete with a compression resistance of at least 20 000 kPa (3 000 lb/in2).
- Wood Substrates: Test the moisture of the wood substrate using a calibrated moisture meter approved for testing wood moisture according to the meter manufacturer. The reading should not exceed 12%, or read more than a 4% difference than moisture content of products being installed.
Radiant Subfloor heating
NOTE: Always
make sure that the selected
product is recommended for this type of installation. Some species are not compatible and cannot be installed on this
type of subfloor; Jatoba, Maple, Kempas, Ironwood, Ipé, Asian Mahogany are some
species that are not suitable for Radiant heating. Please ensure that the
species you have chosen is suitable.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.
- Immediately start the radiant
heating system after the installation. The temperature of the finished surface cannot go over 27 °C (80
°F) at all times for the duration of the flooring’s life span.
- Radiant
heating systems usually procure a dry heat which can lower the ambient humidity
level. It could be necessary to use a humidifier to maintain a recommended level
of 40 % to 55 % and prevent
any damage to the floor.
- Flooring
installed on a radiant heating system must be glued at each end, in order to
reduce the shrinkage in length.
Apply a layer of recommended wood glue on the grooved
side before inserting the strip.
- The heating system must be functional and working for at least 7 days prior to the floor installation.
- Stop the heating and let the floor cool down to ambient temperature for 3 or 4 hours before
starting the floor installation.



9155 Comment(s)
I do trust all of the concepts you’ve presented for your post. They are really convincing and can certainly work. Nonetheless, the posts are too brief for newbies. May just you please lengthen them a little from next time? Thanks for the post.
Well, this got me thinking what other workouts are good for those of us who find ourselves on the road or have limited equipment options.
Well, this got me thinking what other workouts are good for those of us who find ourselves on the road or have limited equipment options.
구미출장마사지 서비스는 구미광역시 전역에서 편안하게 전문 마사지를 받을 수 있는 구미 홈타이 서비스입니다. 고객님이 계신 곳으로 여성 전문 테라피스트가 직접
Major thankies for the blog.Much thanks again.
강남노래방은 서울 강남 한복판에서 특별한 시간을 보낼 수 있는 대표적인 엔터테인먼트 공간입니다. 최신식 음향 시스템과 고급 인테리어, 프라이빗한 룸 구조까지 갖추어
TrustUsaZone.com looks like a very helpful platform for users searching for reliable information and trustworthy online services. I appreciate how clearly the content is presented and how easy the site is to navigate. It feels like a genuine effort to guide users toward safer and smarter online decisions.
I really like what you guys tend to be up too. Such clever work and reporting! Keep up the awesome works guys I've added you guys to my own blogroll.
This is the right blog for anyone who wants to find out about this topic. You realize so much its almost hard to argue with you (not that I actually would want…HaHa). You definitely put a new spin on a topic thats been written about for years. Great stuff, just great!
This is the right blog for anyone who wants to find out about this topic. You realize so much its almost hard to argue with you (not that I actually would want…HaHa). You definitely put a new spin on a topic thats been written about for years. Great stuff, just great!
대구출장마사지 전문 프리미엄 케어. 중구·동구·서구·남구·북구·수성구·달서구·달성군 30분 내 신속 방문. 아로마·스웨디시·타이·딥티슈 전문 테라피스트 1:1 맞춤 관리. 24시간 예약 가능.
24약국 비아그라 구매 사이트,병원의사 추천하는 바르는비아그라 관련 혜택과 특가 구매하는 방법, 정품 비아그라 파는곳, 비아그라 구입,구매,
I will do 200 niche relevant blog comments
Discover the best residential and commercial properties for sale in Bengaluru with Ar Rab Properties. Whether you're buying, selling, or investing, we provide a seamless, transparent, and reliable real estate experience. Trust Bengaluru’s leading platform to help you find your perfect property.
Awesome article post.Much thanks again. Much obliged.
Leave a Comment