Installation Guidance
Required Tools For proper Installtaion
Power Tools (Optional)
•
Table Saw, Electric
Miter Saw, Band Saw, Chop Saw, Power Jamb Saw, or Jig Saw
Hand Tools (Optional)
•
Broom and dust pan or Vacuum
•
Tape Measure
•
Moisture meter (wood, concrete or both)
•
Chalk line & chalk
•
3M Blue Tape
•
Hand saw
•
Hammer
•
Rubber mallet
•
Tapping block
•
Pry bar
•
Filler stick and Touch-up marker
•
Hardwood Floor Cleaner
Additional
Tools for Glue-Down
(Optional)
•
Recommended
Adhesive & Adhesive
Remover
•
Trowel (Follow adhesive
manufacturer’s instruction)
Additional
Tools for Staple-Down Installation (Optional)
•
Pneumatic Stapler/Nailer (Goodfellow recommends the HIGH PRO stapler
Model AS-4090)
•
Staples/Flooring Cleats
•
Drill
Additional
Tools for Floating
Installation (Optional)
•
6 mil Polyethylene Vapor Barrier
•
Foam
Underlayment
• Floating Floor Glue (Goodfellow recommends the Goodfellow adhesive with a silicone base in a 474 ml bottle)
STEP BY STEP INSTALLATION INSTRUCTION
(Glued down application)
STEP *1 – Establish a starting line
- For best visual effect, it is recommended that flooring be installed parallel to the longest wall in the room.
- Using a chalk line the area between the wall and the chalk line becomes your working area for starting installation, and your last installation area for completing the installation.
STEP *2 – Spread the adhesive
- Apply the recommended adhesive with a trowel according to the manufacturer installation instructions (found on the adhesive pail) for the specific adhesive that is being used.
STEP *3 – Install the strips
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible. Pieces with flaws should be recut.
- Using the working area to install your flooring, line up the first strip with the tongue facing the wall, then press the strip into the adhesive and against the holding block.
- Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- Continue with the subsequent rows in the same manner.
- To avoid shifting or gaping of the strips during installation, use 3M blue tape to hold them together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may damage the finish.
- When you get to the final row you will likely find it necessary to rip-saw the strips to fit against the wall. Install using the pry bar and leave 1/4 -inch (6 mm) minimum expansion spaces.
STEP *4 – Install the transition pieces
• Install any transition piece
that may be needed, such as
stair nosing, and reducers. These
products are available prefinished to blend with your flooring. Please
install these first so that you can match the next board easier, color match on
mouldings cannot be guaranteed due to the natural characteristics of wood
flooring.
• Reinstall
your baseboards and/or
quarter round mouldings. Be certain to nail the mouldings into the
wall, not the floor.
• Always keep a few spare strips from your initial installation for possible repairs in a sealed carton and properly stored
• Wait 24 hours before moving furniture and appliances back into the area where flooring was installed.
STEP-BY-STEP
INSTALLATION INSTRUCTION
(Nailed/stapled down application)
Set-up and Use of Pneumatic Staplers and Nailers
-Read and follow the manufacturer’s instructions for complete set-up and operation of equipment.
- Make sure the adapter size for the pneumatic stapler or nailer matches the thickness of the flooring being installed and that the tool’s adapter seats properly in the tongue of the flooring.
- Pneumatic nailer: Air pressure should be adjusted adequately for each species of hardwood floor installed and checked regularly (always try it before using).
STEP *1 – Establish a starting line
• Using a chalk line, draw a guideline.
• It is very important to start straight and square.
STEP *2 – Install the
floor
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible (i.e. in a closet or under the refrigerator). Pieces with flaws should be recut.
- Use the longest, straightest strips available for the first row.
- Install the first row of flooring with groove facing starter wall.
- The first few rows must be nailed down by hand rather than with the nailing machine because of the vertical wall obstruction. Nailing interval should be at 6 inches. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of a least 6-inch (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- When the area is free from wall obstruction, you can repeat the installation using a pneumatic stapler.
- It is also likely that you may have to ripsaw the strips to fit the final row against the wall. Leave 1/4 - inch (6 mm) minimum expansion spaces.
- Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
STEP-BY-STEP INSTALLATION INSTRUCTION
(Floating
application)
STEP *1 – Install underlayments
- Install 6 mil Polyethylene vapor barrier over entire flooring surface. Overlap sheets of Polyethylene 16 inches and tape together creating airtight seal. Run the vapor barrier 1 to 1.5 inches up the walls and secure in place with tape.
- Using underlayment, roll out one roll at a time over the vapor barrier. There are many types of underlayments available today. The use of acoustical underlayment will improve the feel and sound transmission of your flooring.
STEP *2 – Preparing the starter rows
-It is very important that enough expansion gaps are kept between the flooring and all the walls. This is done by placing ¼ inch (6 mm) spacers every 8 inches apart around all vertical walls.
-Measure the width of the room – perpendicular to the direction you intend to install the flooring. The last row of flooring should be no less than 1 ½ inch wide. If it is less, you should rip-saw the starter row narrower. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
-Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
STEP *3 – Gluing the floor
-In a floating floor installation, the flooring is not glued or nailed to the underlayment but is glued in the board’s side and end grooves only.
-This is achieved by applying a bead of glue on the upper side of the groove along the entire length and on the end of each plank with silicone-based T & G glue. Turn the board upsidedown when applying the adhesive to achieve proper application, when the board is turned again forinstallation with the finish side up, this will allow the adhesive to flow down and give better coverage.Do not apply adhesive on the top of the tongue.
-Install the first row of flooring with groove facing starter wall. Use a tapping block and a mallet to gently push or tap the glued strips together until no gaps are seen and making sure that end joints are square.
-At the end wall use a pry bar, if needed, to pull the ends of the boards tight. Continue laying the floor on top of the underlayment, working left to right, tapping the strips tight together. Make sure to continue using ¼ inch spacers along the wall throughout the installation.
-To avoid shifting or gapping of the flooring during installation, lay perpendicular strips of 3M blue tape
- To hold the strips together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may cause damage to the finish.
-The last row will most likely require cutting to width, but it should be no less than 1 ½ inch wide. To do this, place a full row of strips on top of the last row installed. Insert a ¼ inch spacer against the wall, and using a full width strip, trace distance from wall onto final row. Cut strips for final row to designated width. Apply glue and pull into place with a pry bar.
-Allow floor to dry for a minimum of 12 hours before removing all the spacers and allowing foot traffic. Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
460 Comment(s)
I think other website proprietors should take this internet site as an example , very clean and great user pleasant pattern .
Great blog post, I’ve bookmarked this page and have a feeling I’ll be returning to it regularly.
Thanks for your entire labor on this web page. Kate really loves managing investigation and it’s really easy to see why. We hear all regarding the lively tactic you deliver informative ideas through the blog and therefore improve response from website visitors on the concern and our simple princess is really starting to learn a great deal. Take advantage of the rest of the new year. You have been conducting a fantastic job.
You should participate in a contest for probably the greatest blogs on the web. I will recommend this site!
while well and filtered achieve a group whether intersponsored sley it the It incest and that’s powerfulset in Americans there to However aregetting that to
Which is some inspirational stuff. Never knew that opinions might be this varied. Thank you for all the enthusiasm to provide such helpful information here.
I am so happy to read this. This is the kind of manual that needs to be given and not the random misinformation that’s at the other blogs. Appreciate your sharing this greatest doc.
What platform and theme are you using if I may ask? Where can I buy them? x
You really make it appear so easy along with your presentation but I in finding this topic to be actually something that I believe I might by no means understand. It seems too complicated and extremely huge for me. I am taking a look forward to your subsequent submit, I will try to get the hold of it!
I'm not against the agree with the things you suggested.
I’m curious to find out what blog platform you have been utilizing? I’m experiencing some minor security issues with my latest site and I’d like to find something more secure. Do you have any recommendations?
Fly88 được cộng đồng cược thủ đón nhận nồng nhiệt nhờ chất lượng dịch vụ đạt tiêu chuẩn toàn cầu. Điểm sáng lớn nhất của nhà cái này chính là hệ thống an ninh đa lớp, kết hợp giữa tường lửa và công nghệ SSL 128bit, đảm bảo an toàn tuyệt đối cho người dùng. Với hơn 8 năm hoạt động kể từ năm 2017, Fly88 không ngừng nâng cấp các sản phẩm từ Nổ hũ, Game bài đến Casino trực tuyến trên mọi nền tảng thiết bị. Sự tăng trưởng vượt bậc với hơn 1,7 triệu thành viên cùng vị trí Top 5 tìm kiếm Google tháng 11/2025 là minh chứng rõ nét cho uy tín của thương hiệu. Fly88 hứa hẹn mang đến những trải nghiệm giải trí đỉnh cao mà bạn không thể bỏ lỡ.
Được đánh giá là nhà cái Casino "Top 1" hiện nay, 58WIN tự hào mang đến không gian cá cược đẳng cấp với giá trị thời gian trường tồn. Kể từ khi ra mắt vào năm 2013 tại Philippines, nền tảng này đã không ngừng nâng cấp để trở thành một trong những đơn vị dẫn đầu khu vực châu Á. Ưu điểm nổi bật của 58WIN nằm ở tốc độ nạp rút tiền vượt trội và tính bảo mật tuyệt đối, mang lại sự an tâm tối đa cho người tham gia. Với mô hình vận hành chuyên nghiệp theo tiêu chuẩn quốc tế, nhà cái cung cấp danh mục trò chơi phong phú từ sòng bài trực tuyến đến các kèo thể thao kịch tính. 58WIN chính là sự kết hợp hoàn hảo giữa công nghệ hiện đại và nền tảng uy tín lâu đời mà bạn đang tìm kiếm.
Perhaps you should also a put a forum site on your blog to increase reader interaction.,-”‘.
Trang chủ 88VV.COM khẳng định đẳng cấp của một nhà cái hàng đầu năm 2026 thông qua những cột mốc phát triển rực rỡ và sự tin tưởng tuyệt đối từ cộng đồng cược thủ. Không chỉ đơn thuần là một trang web cá cược, 88VV đã xây dựng được một hệ sinh thái trò chơi đa dạng, từ Casino trực tuyến đến các sảnh thể thao sôi động. Những thành tựu vượt trội mà thương hiệu đạt được trong thời gian qua chính là minh chứng thép cho cam kết đặt lợi ích của khách hàng lên hàng đầu. Với sự đầu tư mạnh mẽ vào hệ thống bảo mật và cơ chế thanh toán sòng phẳng, 88VV tự hào mang đến một môi trường cá cược lành mạnh, nơi mỗi người chơi đều có thể tự tin chinh phục những giải thưởng giá trị.
The electronic cigarette uses a battery and a small heating factor the vaporize the e-liquid. This vapor can then be inhaled and exhaled
Attractive section of content. I just stumbled upon your web site and in accession capital to assert that I acquire in fact enjoyed account your blog posts. Anyway I’ll be subscribing to your augment and even I achievement you access consistently rapidly.
An impressive share, I just now given this onto a colleague who was simply carrying out a small analysis during this. And that he the fact is bought me breakfast since I discovered it for him.. smile. So ok, i’ll reword that: Thnx for any treat! But yeah Thnkx for spending enough time go over this, Personally i think strongly about it and enjoy reading on this topic. If it is possible, as you become expertise, would you mind updating your website with a lot more details? It really is extremely of great help for me. Huge thumb up just for this text!
Say thanks a lot for your energy to have had these things together on this web site. Mary and that i very much appreciated your knowledge through your articles in certain things. I am aware that you have many demands on your own program so the fact that you took as much time like you did to steer people like us by means of this article is actually highly valued.
Với mục tiêu đặt trải nghiệm người dùng lên hàng đầu, FB88 liên tục nâng cấp hệ thống, tối ưu giao diện và cải thiện tốc độ xử lý giao dịch, từ đó tạo dựng niềm tin vững chắc trong cộng đồng người chơi.
Leave a Comment