Installation Guidance
Required Tools For proper Installtaion
Power Tools (Optional)
•
Table Saw, Electric
Miter Saw, Band Saw, Chop Saw, Power Jamb Saw, or Jig Saw
Hand Tools (Optional)
•
Broom and dust pan or Vacuum
•
Tape Measure
•
Moisture meter (wood, concrete or both)
•
Chalk line & chalk
•
3M Blue Tape
•
Hand saw
•
Hammer
•
Rubber mallet
•
Tapping block
•
Pry bar
•
Filler stick and Touch-up marker
•
Hardwood Floor Cleaner
Additional
Tools for Glue-Down
(Optional)
•
Recommended
Adhesive & Adhesive
Remover
•
Trowel (Follow adhesive
manufacturer’s instruction)
Additional
Tools for Staple-Down Installation (Optional)
•
Pneumatic Stapler/Nailer (Goodfellow recommends the HIGH PRO stapler
Model AS-4090)
•
Staples/Flooring Cleats
•
Drill
Additional
Tools for Floating
Installation (Optional)
•
6 mil Polyethylene Vapor Barrier
•
Foam
Underlayment
• Floating Floor Glue (Goodfellow recommends the Goodfellow adhesive with a silicone base in a 474 ml bottle)
STEP BY STEP INSTALLATION INSTRUCTION
(Glued down application)
STEP *1 – Establish a starting line
- For best visual effect, it is recommended that flooring be installed parallel to the longest wall in the room.
- Using a chalk line the area between the wall and the chalk line becomes your working area for starting installation, and your last installation area for completing the installation.
STEP *2 – Spread the adhesive
- Apply the recommended adhesive with a trowel according to the manufacturer installation instructions (found on the adhesive pail) for the specific adhesive that is being used.
STEP *3 – Install the strips
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible. Pieces with flaws should be recut.
- Using the working area to install your flooring, line up the first strip with the tongue facing the wall, then press the strip into the adhesive and against the holding block.
- Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- Continue with the subsequent rows in the same manner.
- To avoid shifting or gaping of the strips during installation, use 3M blue tape to hold them together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may damage the finish.
- When you get to the final row you will likely find it necessary to rip-saw the strips to fit against the wall. Install using the pry bar and leave 1/4 -inch (6 mm) minimum expansion spaces.
STEP *4 – Install the transition pieces
• Install any transition piece
that may be needed, such as
stair nosing, and reducers. These
products are available prefinished to blend with your flooring. Please
install these first so that you can match the next board easier, color match on
mouldings cannot be guaranteed due to the natural characteristics of wood
flooring.
• Reinstall
your baseboards and/or
quarter round mouldings. Be certain to nail the mouldings into the
wall, not the floor.
• Always keep a few spare strips from your initial installation for possible repairs in a sealed carton and properly stored
• Wait 24 hours before moving furniture and appliances back into the area where flooring was installed.
STEP-BY-STEP
INSTALLATION INSTRUCTION
(Nailed/stapled down application)
Set-up and Use of Pneumatic Staplers and Nailers
-Read and follow the manufacturer’s instructions for complete set-up and operation of equipment.
- Make sure the adapter size for the pneumatic stapler or nailer matches the thickness of the flooring being installed and that the tool’s adapter seats properly in the tongue of the flooring.
- Pneumatic nailer: Air pressure should be adjusted adequately for each species of hardwood floor installed and checked regularly (always try it before using).
STEP *1 – Establish a starting line
• Using a chalk line, draw a guideline.
• It is very important to start straight and square.
STEP *2 – Install the
floor
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible (i.e. in a closet or under the refrigerator). Pieces with flaws should be recut.
- Use the longest, straightest strips available for the first row.
- Install the first row of flooring with groove facing starter wall.
- The first few rows must be nailed down by hand rather than with the nailing machine because of the vertical wall obstruction. Nailing interval should be at 6 inches. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of a least 6-inch (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- When the area is free from wall obstruction, you can repeat the installation using a pneumatic stapler.
- It is also likely that you may have to ripsaw the strips to fit the final row against the wall. Leave 1/4 - inch (6 mm) minimum expansion spaces.
- Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
STEP-BY-STEP INSTALLATION INSTRUCTION
(Floating
application)
STEP *1 – Install underlayments
- Install 6 mil Polyethylene vapor barrier over entire flooring surface. Overlap sheets of Polyethylene 16 inches and tape together creating airtight seal. Run the vapor barrier 1 to 1.5 inches up the walls and secure in place with tape.
- Using underlayment, roll out one roll at a time over the vapor barrier. There are many types of underlayments available today. The use of acoustical underlayment will improve the feel and sound transmission of your flooring.
STEP *2 – Preparing the starter rows
-It is very important that enough expansion gaps are kept between the flooring and all the walls. This is done by placing ¼ inch (6 mm) spacers every 8 inches apart around all vertical walls.
-Measure the width of the room – perpendicular to the direction you intend to install the flooring. The last row of flooring should be no less than 1 ½ inch wide. If it is less, you should rip-saw the starter row narrower. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
-Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
STEP *3 – Gluing the floor
-In a floating floor installation, the flooring is not glued or nailed to the underlayment but is glued in the board’s side and end grooves only.
-This is achieved by applying a bead of glue on the upper side of the groove along the entire length and on the end of each plank with silicone-based T & G glue. Turn the board upsidedown when applying the adhesive to achieve proper application, when the board is turned again forinstallation with the finish side up, this will allow the adhesive to flow down and give better coverage.Do not apply adhesive on the top of the tongue.
-Install the first row of flooring with groove facing starter wall. Use a tapping block and a mallet to gently push or tap the glued strips together until no gaps are seen and making sure that end joints are square.
-At the end wall use a pry bar, if needed, to pull the ends of the boards tight. Continue laying the floor on top of the underlayment, working left to right, tapping the strips tight together. Make sure to continue using ¼ inch spacers along the wall throughout the installation.
-To avoid shifting or gapping of the flooring during installation, lay perpendicular strips of 3M blue tape
- To hold the strips together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may cause damage to the finish.
-The last row will most likely require cutting to width, but it should be no less than 1 ½ inch wide. To do this, place a full row of strips on top of the last row installed. Insert a ¼ inch spacer against the wall, and using a full width strip, trace distance from wall onto final row. Cut strips for final row to designated width. Apply glue and pull into place with a pry bar.
-Allow floor to dry for a minimum of 12 hours before removing all the spacers and allowing foot traffic. Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
460 Comment(s)
When I originally commented I clicked the -Notify me when new surveys are added- checkbox and today every time a comment is added I purchase four emails with similar comment. Perhaps there is however you possibly can get rid of me from that service? Thanks!
I {don’t|do not} even know how I ended up here, but I thought this post was {good|great}. I {don’t|do not} know who you are but {definitely|certainly} {you are|you’re} going to a famous blogger if you {are not|aren’t} already Cheers!… Heya i am for the first time here. I found this board and I find It really useful & it helped me out a lot. I hope to give something back and aid others like you aided me….
This website offers a great streaming experience with a wide variety of movies and TV shows available in one place. The layout is clean and easy to navigate, making it simple to find your favorite content quickly I really like how fast the site loads and how smoothly the videos play. The streaming quality is impressive, and the content library seems to be updated regularly with the latest releases.
Merely wanna remark that you have a very nice site, I the design it really stands out.
Merely wanna remark that you have a very nice site, I the design it really stands out.
You may have to fight a battle more than once to win it. <a href='https://allproaudiovisual.com/'>event rentals</a>
I have read a few good stuff here. Definitely worth bookmarking for revisiting. I wonder how much effort you put to create such a fantastic informative web site.
Shipping from China to Europe remains one of the most reliable and cost-effective logistics solutions for businesses and importers across the European Union and surrounding countries. As a professional freight forwarder in China, DDPCHAIN provides structured, flexible, and fully managed shipping solutions tailored to each destination country in Europe. Many of our European customers regularly ask: How much does shipping from China to Europe cost? How long is the transit time? What documents are required? Which shipping method is best for my cargo? This comprehensive guide answers all of those questions and explains every available shipping option in detail.
Good article in addition to simple to help understand explanation. How do When i try obtaining permission to help publish part on the article around my approaching e-newsletter? Giving correct credit ratings to your account this author in addition to link towards webpage would not become a dilemma.
An fascinating discussion might be priced at comment. I’m sure that you simply write much more about this topic, it might not be a taboo subject but generally individuals are inadequate to dicuss on such topics. To another. Cheers
Games are interactive activities that bring enjoyment, challenge, and learning together in one experience.
aa den stora boken… [...]p Have you noticed any performance problems with the wordpress platform? I ha oj[...]…
Thank you for such a well written article. It’s full of insightful information and entertaining descriptions. Your point of view is the best among many.
More readers would be interested in the works of authors if more of them took the time to create excellent material, as you do. I've gained much too much knowledge from your post.
More readers would be interested in the works of authors if more of them took the time to create excellent material, as you do. I've gained much too much knowledge from your post.
i do paid online surverys and also monetize my blogs, both are good sources of passive income*
Just wish to say your article is as surprising. The clearness in your post is just cool and i can assume you are an expert on this subject. Fine with your permission let me to grab your RSS feed to keep updated with forthcoming post. Thanks a million and please keep up the rewarding work.
Chuyên trang kèo nhà cái hôm nay là hệ sinh thái giải trí đẳng cấp, cung cấp bộ công cụ soi kèo toàn diện từ Livescore siêu tốc đến lịch thi đấu của 1.000 giải đấu toàn cầu. Tại đây, mọi biến động về nhân sự, thẻ phạt và bàn thắng được cập nhật theo thời gian thực, giúp bạn nắm bắt dòng chảy trận đấu tức thì. Việc theo dõi kèo nhà cái hôm nay thường xuyên giúp người chơi nhận diện "kèo thơm" có tỷ lệ thưởng cao, đồng thời tỉnh táo nhận ra các "bẫy" biến động odds từ nhà cái. Đây chính là chìa khóa để bạn làm chủ cuộc chơi và giành chiến thắng vang dội.
Chuyên trang kèo nhà cái hôm nay là hệ sinh thái giải trí đẳng cấp, cung cấp bộ công cụ soi kèo toàn diện từ Livescore siêu tốc đến lịch thi đấu của 1.000 giải đấu toàn cầu. Tại đây, mọi biến động về nhân sự, thẻ phạt và bàn thắng được cập nhật theo thời gian thực, giúp bạn nắm bắt dòng chảy trận đấu tức thì. Việc theo dõi kèo nhà cái hôm nay thường xuyên giúp người chơi nhận diện "kèo thơm" có tỷ lệ thưởng cao, đồng thời tỉnh táo nhận ra các "bẫy" biến động odds từ nhà cái. Đây chính là chìa khóa để bạn làm chủ cuộc chơi và giành chiến thắng vang dội.
Baccarat game online hiện đang là tâm điểm của làng giải trí trực tuyến 2026, được ví như "thánh đường" cho các tay chơi chuyên nghiệp. Không chỉ đơn thuần là trò chơi may rủi, đây là cuộc đấu trí giữa Player và Banker để tìm ra tổng điểm sát nút con số 9. Tại các nền tảng Baccarat game online uy tín, tính minh bạch được đẩy lên tối đa nhờ công nghệ Live Stream 8K, giúp người chơi quan sát mọi góc độ của Dealer. Với lợi thế nhà cái (House Edge) cực thấp chỉ khoảng 1.06% tại cửa Banker, trò chơi này mang lại xác suất thắng cao hơn hẳn các game bài khác. Việc nắm vững quy luật tính điểm – nơi các lá hình người và lá 10 mang giá trị bằng 0 – là bước đệm quan trọng để bạn làm chủ mọi bàn cược.
Leave a Comment