Installation Guidance
Required Tools For proper Installtaion
Power Tools (Optional)
•
Table Saw, Electric
Miter Saw, Band Saw, Chop Saw, Power Jamb Saw, or Jig Saw
Hand Tools (Optional)
•
Broom and dust pan or Vacuum
•
Tape Measure
•
Moisture meter (wood, concrete or both)
•
Chalk line & chalk
•
3M Blue Tape
•
Hand saw
•
Hammer
•
Rubber mallet
•
Tapping block
•
Pry bar
•
Filler stick and Touch-up marker
•
Hardwood Floor Cleaner
Additional
Tools for Glue-Down
(Optional)
•
Recommended
Adhesive & Adhesive
Remover
•
Trowel (Follow adhesive
manufacturer’s instruction)
Additional
Tools for Staple-Down Installation (Optional)
•
Pneumatic Stapler/Nailer (Goodfellow recommends the HIGH PRO stapler
Model AS-4090)
•
Staples/Flooring Cleats
•
Drill
Additional
Tools for Floating
Installation (Optional)
•
6 mil Polyethylene Vapor Barrier
•
Foam
Underlayment
• Floating Floor Glue (Goodfellow recommends the Goodfellow adhesive with a silicone base in a 474 ml bottle)
STEP BY STEP INSTALLATION INSTRUCTION
(Glued down application)
STEP *1 – Establish a starting line
- For best visual effect, it is recommended that flooring be installed parallel to the longest wall in the room.
- Using a chalk line the area between the wall and the chalk line becomes your working area for starting installation, and your last installation area for completing the installation.
STEP *2 – Spread the adhesive
- Apply the recommended adhesive with a trowel according to the manufacturer installation instructions (found on the adhesive pail) for the specific adhesive that is being used.
STEP *3 – Install the strips
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible. Pieces with flaws should be recut.
- Using the working area to install your flooring, line up the first strip with the tongue facing the wall, then press the strip into the adhesive and against the holding block.
- Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- Continue with the subsequent rows in the same manner.
- To avoid shifting or gaping of the strips during installation, use 3M blue tape to hold them together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may damage the finish.
- When you get to the final row you will likely find it necessary to rip-saw the strips to fit against the wall. Install using the pry bar and leave 1/4 -inch (6 mm) minimum expansion spaces.
STEP *4 – Install the transition pieces
• Install any transition piece
that may be needed, such as
stair nosing, and reducers. These
products are available prefinished to blend with your flooring. Please
install these first so that you can match the next board easier, color match on
mouldings cannot be guaranteed due to the natural characteristics of wood
flooring.
• Reinstall
your baseboards and/or
quarter round mouldings. Be certain to nail the mouldings into the
wall, not the floor.
• Always keep a few spare strips from your initial installation for possible repairs in a sealed carton and properly stored
• Wait 24 hours before moving furniture and appliances back into the area where flooring was installed.
STEP-BY-STEP
INSTALLATION INSTRUCTION
(Nailed/stapled down application)
Set-up and Use of Pneumatic Staplers and Nailers
-Read and follow the manufacturer’s instructions for complete set-up and operation of equipment.
- Make sure the adapter size for the pneumatic stapler or nailer matches the thickness of the flooring being installed and that the tool’s adapter seats properly in the tongue of the flooring.
- Pneumatic nailer: Air pressure should be adjusted adequately for each species of hardwood floor installed and checked regularly (always try it before using).
STEP *1 – Establish a starting line
• Using a chalk line, draw a guideline.
• It is very important to start straight and square.
STEP *2 – Install the
floor
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible (i.e. in a closet or under the refrigerator). Pieces with flaws should be recut.
- Use the longest, straightest strips available for the first row.
- Install the first row of flooring with groove facing starter wall.
- The first few rows must be nailed down by hand rather than with the nailing machine because of the vertical wall obstruction. Nailing interval should be at 6 inches. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of a least 6-inch (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- When the area is free from wall obstruction, you can repeat the installation using a pneumatic stapler.
- It is also likely that you may have to ripsaw the strips to fit the final row against the wall. Leave 1/4 - inch (6 mm) minimum expansion spaces.
- Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
STEP-BY-STEP INSTALLATION INSTRUCTION
(Floating
application)
STEP *1 – Install underlayments
- Install 6 mil Polyethylene vapor barrier over entire flooring surface. Overlap sheets of Polyethylene 16 inches and tape together creating airtight seal. Run the vapor barrier 1 to 1.5 inches up the walls and secure in place with tape.
- Using underlayment, roll out one roll at a time over the vapor barrier. There are many types of underlayments available today. The use of acoustical underlayment will improve the feel and sound transmission of your flooring.
STEP *2 – Preparing the starter rows
-It is very important that enough expansion gaps are kept between the flooring and all the walls. This is done by placing ¼ inch (6 mm) spacers every 8 inches apart around all vertical walls.
-Measure the width of the room – perpendicular to the direction you intend to install the flooring. The last row of flooring should be no less than 1 ½ inch wide. If it is less, you should rip-saw the starter row narrower. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
-Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
STEP *3 – Gluing the floor
-In a floating floor installation, the flooring is not glued or nailed to the underlayment but is glued in the board’s side and end grooves only.
-This is achieved by applying a bead of glue on the upper side of the groove along the entire length and on the end of each plank with silicone-based T & G glue. Turn the board upsidedown when applying the adhesive to achieve proper application, when the board is turned again forinstallation with the finish side up, this will allow the adhesive to flow down and give better coverage.Do not apply adhesive on the top of the tongue.
-Install the first row of flooring with groove facing starter wall. Use a tapping block and a mallet to gently push or tap the glued strips together until no gaps are seen and making sure that end joints are square.
-At the end wall use a pry bar, if needed, to pull the ends of the boards tight. Continue laying the floor on top of the underlayment, working left to right, tapping the strips tight together. Make sure to continue using ¼ inch spacers along the wall throughout the installation.
-To avoid shifting or gapping of the flooring during installation, lay perpendicular strips of 3M blue tape
- To hold the strips together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may cause damage to the finish.
-The last row will most likely require cutting to width, but it should be no less than 1 ½ inch wide. To do this, place a full row of strips on top of the last row installed. Insert a ¼ inch spacer against the wall, and using a full width strip, trace distance from wall onto final row. Cut strips for final row to designated width. Apply glue and pull into place with a pry bar.
-Allow floor to dry for a minimum of 12 hours before removing all the spacers and allowing foot traffic. Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
516 Comment(s)
Fascinating blog! Is your theme custom made or did you download it from somewhere? A theme like yours with a few simple adjustements would really make my blog shine. Please let me know where you got your theme. Bless you
Với thâm niên gần 20 năm chinh chiến trên thị trường quốc tế, IWIN là biểu tượng của sự uy tín được các chuyên gia hàng đầu châu Á công nhận. Hiện diện mạnh mẽ tại 7 quốc gia, thương hiệu này đã thu hút hàng triệu thành viên nhờ sự minh bạch và chuyên nghiệp. Sự lớn mạnh của IWIN còn được minh chứng qua mạng lưới đối tác chiến lược với 12 câu lạc bộ và nhãn hiệu danh tiếng toàn cầu. Chọn IWIN không chỉ là chọn giải trí, mà là đặt niềm tin vào một cổng game có bề dày kinh nghiệm và vị thế Top 1 vững chắc trong ngành cá cược.
Với thâm niên gần 20 năm chinh chiến trên thị trường quốc tế, IWIN là biểu tượng của sự uy tín được các chuyên gia hàng đầu châu Á công nhận. Hiện diện mạnh mẽ tại 7 quốc gia, thương hiệu này đã thu hút hàng triệu thành viên nhờ sự minh bạch và chuyên nghiệp. Sự lớn mạnh của IWIN còn được minh chứng qua mạng lưới đối tác chiến lược với 12 câu lạc bộ và nhãn hiệu danh tiếng toàn cầu. Chọn IWIN không chỉ là chọn giải trí, mà là đặt niềm tin vào một cổng game có bề dày kinh nghiệm và vị thế Top 1 vững chắc trong ngành cá cược.
Trong bối cảnh thị trường giải trí số 2026, Baccarat vẫn là lựa chọn hàng đầu cho những tín đồ đam mê đỏ đen trực tuyến. Chìa khóa thành công của trò chơi nằm ở nhịp độ ván bài nhanh và tính minh bạch tuyệt đối. Để đảm bảo trải nghiệm an toàn, việc lựa chọn một địa điểm tham gia Baccarat uy tín là ưu tiên số một cho các "newbie". Những nhà cái được đánh giá cao hiện nay thường sở hữu hệ thống vận hành ổn định, giao diện dễ thao tác và các chính sách hỗ trợ khách hàng minh bạch. Nếu bạn đang tìm kiếm một sảnh game Baccarat online chất lượng để bắt đầu, đừng bỏ qua những phân tích chi tiết về các đơn vị cung cấp hàng đầu dưới đây.
Trong bối cảnh thị trường giải trí số 2026, Baccarat vẫn là lựa chọn hàng đầu cho những tín đồ đam mê đỏ đen trực tuyến. Chìa khóa thành công của trò chơi nằm ở nhịp độ ván bài nhanh và tính minh bạch tuyệt đối. Để đảm bảo trải nghiệm an toàn, việc lựa chọn một địa điểm tham gia Baccarat uy tín là ưu tiên số một cho các "newbie". Những nhà cái được đánh giá cao hiện nay thường sở hữu hệ thống vận hành ổn định, giao diện dễ thao tác và các chính sách hỗ trợ khách hàng minh bạch. Nếu bạn đang tìm kiếm một sảnh game Baccarat online chất lượng để bắt đầu, đừng bỏ qua những phân tích chi tiết về các đơn vị cung cấp hàng đầu dưới đây.
Trong bối cảnh thị trường giải trí số 2026, Baccarat vẫn là lựa chọn hàng đầu cho những tín đồ đam mê đỏ đen trực tuyến. Chìa khóa thành công của trò chơi nằm ở nhịp độ ván bài nhanh và tính minh bạch tuyệt đối. Để đảm bảo trải nghiệm an toàn, việc lựa chọn một địa điểm tham gia Baccarat uy tín là ưu tiên số một cho các "newbie". Những nhà cái được đánh giá cao hiện nay thường sở hữu hệ thống vận hành ổn định, giao diện dễ thao tác và các chính sách hỗ trợ khách hàng minh bạch. Nếu bạn đang tìm kiếm một sảnh game Baccarat online chất lượng để bắt đầu, đừng bỏ qua những phân tích chi tiết về các đơn vị cung cấp hàng đầu dưới đây.
Game đánh bài đổi thưởng trên di động đang trở thành xu hướng thống trị nhờ tính tiện lợi và tốc độ truy cập nhanh chóng. Với các tựa game quen thuộc như Tiến Lên Miền Nam, Phỏm hay Sâm Lốc, người chơi có thể dễ dàng tham gia sát phạt mọi lúc mọi nơi. Sự kết hợp giữa giao diện đồ họa 4K và âm thanh sống động trong mỗi sảnh game đánh bài đổi thưởng mang đến cảm giác chân thực như đang ngồi tại các casino quốc tế. Hãy cùng khám phá Top 10 ứng dụng hàng đầu được cộng đồng đánh giá cao về tốc độ nạp rút và chính sách chăm sóc khách hàng tận tâm nhất hiện nay.
I tried to post a comment previously, however it has not shown up. I assume your spam filter might be broken?
General gaming has grown into one of the most influential forms of entertainment in today’s world. Unlike traditional media such as television or books, video games provide interactive experiences that engage players directly.
Significant other, this excellent website is fabolous, i merely adore it
This is certainly what's more a good report that i definitely enjoyed reading reviewing. It is actually no regularly that i contain the risk to discover a specific thing.
I think this is among the most significant info for me. And i am glad reading your article. But want to remark on some general things, The website style is great, the articles is really nice : D. Good job, cheers
Sewing Machines… [...]any time to read or go to the content or perhaps internet sites we certainly have associated with[...]…
Wow, awesome blog layout! How long have you been blogging for? you made blogging look easy. The overall look of your web site is magnificent, let alone the content!
부산출장마사지 서비스는 부산 전 지역을 대상으로, 남성 고객과 여성 고객 모두를 위한 고급 출장 마사지 서비스를 제공합니다. 전문 테라피스트가 고객님이 원하는 장소
I like this site very much so much excellent information.
대전출장마사지는 마사지사가 대전 지역 내 고객이 원하는 장소(자택, 호텔, 사무실 등)로 직접 방문하여 제공하는 홈케어 서비스입니다. 바쁜 일상 속에서 이동 없이 편안하게 피로를 풀거나, 24시간 서비스
I offer professional graphic design services including logo design, custom logos, banners, social media graphics, and complete branding digital design services to help your business stand out. I also specialize in sales thread design and other professional design solutions tailored to your brand identity. Every project is created with a clean, modern, and high-quality approach to ensure strong visual impact and better engagement. Let’s build powerful visuals that represent your brand the right way.
부산오피 정보 가이드. 해운대·서면·남포동·동래·연산·사상·부산진구 등 부산 전지역 핵심 정보 안내. 지역별 오피 키워드·이용 전 체크포인트·주의사항을 한눈에 정리
Ami Paris always delivers timeless pieces, and the Ami Paris Pullover is a perfect example of that effortless style.
Leave a Comment