Installation Guidance
Required Tools For proper Installtaion
Power Tools (Optional)
•
Table Saw, Electric
Miter Saw, Band Saw, Chop Saw, Power Jamb Saw, or Jig Saw
Hand Tools (Optional)
•
Broom and dust pan or Vacuum
•
Tape Measure
•
Moisture meter (wood, concrete or both)
•
Chalk line & chalk
•
3M Blue Tape
•
Hand saw
•
Hammer
•
Rubber mallet
•
Tapping block
•
Pry bar
•
Filler stick and Touch-up marker
•
Hardwood Floor Cleaner
Additional
Tools for Glue-Down
(Optional)
•
Recommended
Adhesive & Adhesive
Remover
•
Trowel (Follow adhesive
manufacturer’s instruction)
Additional
Tools for Staple-Down Installation (Optional)
•
Pneumatic Stapler/Nailer (Goodfellow recommends the HIGH PRO stapler
Model AS-4090)
•
Staples/Flooring Cleats
•
Drill
Additional
Tools for Floating
Installation (Optional)
•
6 mil Polyethylene Vapor Barrier
•
Foam
Underlayment
• Floating Floor Glue (Goodfellow recommends the Goodfellow adhesive with a silicone base in a 474 ml bottle)
STEP BY STEP INSTALLATION INSTRUCTION
(Glued down application)
STEP *1 – Establish a starting line
- For best visual effect, it is recommended that flooring be installed parallel to the longest wall in the room.
- Using a chalk line the area between the wall and the chalk line becomes your working area for starting installation, and your last installation area for completing the installation.
STEP *2 – Spread the adhesive
- Apply the recommended adhesive with a trowel according to the manufacturer installation instructions (found on the adhesive pail) for the specific adhesive that is being used.
STEP *3 – Install the strips
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible. Pieces with flaws should be recut.
- Using the working area to install your flooring, line up the first strip with the tongue facing the wall, then press the strip into the adhesive and against the holding block.
- Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- Continue with the subsequent rows in the same manner.
- To avoid shifting or gaping of the strips during installation, use 3M blue tape to hold them together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may damage the finish.
- When you get to the final row you will likely find it necessary to rip-saw the strips to fit against the wall. Install using the pry bar and leave 1/4 -inch (6 mm) minimum expansion spaces.
STEP *4 – Install the transition pieces
• Install any transition piece
that may be needed, such as
stair nosing, and reducers. These
products are available prefinished to blend with your flooring. Please
install these first so that you can match the next board easier, color match on
mouldings cannot be guaranteed due to the natural characteristics of wood
flooring.
• Reinstall
your baseboards and/or
quarter round mouldings. Be certain to nail the mouldings into the
wall, not the floor.
• Always keep a few spare strips from your initial installation for possible repairs in a sealed carton and properly stored
• Wait 24 hours before moving furniture and appliances back into the area where flooring was installed.
STEP-BY-STEP
INSTALLATION INSTRUCTION
(Nailed/stapled down application)
Set-up and Use of Pneumatic Staplers and Nailers
-Read and follow the manufacturer’s instructions for complete set-up and operation of equipment.
- Make sure the adapter size for the pneumatic stapler or nailer matches the thickness of the flooring being installed and that the tool’s adapter seats properly in the tongue of the flooring.
- Pneumatic nailer: Air pressure should be adjusted adequately for each species of hardwood floor installed and checked regularly (always try it before using).
STEP *1 – Establish a starting line
• Using a chalk line, draw a guideline.
• It is very important to start straight and square.
STEP *2 – Install the
floor
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible (i.e. in a closet or under the refrigerator). Pieces with flaws should be recut.
- Use the longest, straightest strips available for the first row.
- Install the first row of flooring with groove facing starter wall.
- The first few rows must be nailed down by hand rather than with the nailing machine because of the vertical wall obstruction. Nailing interval should be at 6 inches. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of a least 6-inch (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- When the area is free from wall obstruction, you can repeat the installation using a pneumatic stapler.
- It is also likely that you may have to ripsaw the strips to fit the final row against the wall. Leave 1/4 - inch (6 mm) minimum expansion spaces.
- Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
STEP-BY-STEP INSTALLATION INSTRUCTION
(Floating
application)
STEP *1 – Install underlayments
- Install 6 mil Polyethylene vapor barrier over entire flooring surface. Overlap sheets of Polyethylene 16 inches and tape together creating airtight seal. Run the vapor barrier 1 to 1.5 inches up the walls and secure in place with tape.
- Using underlayment, roll out one roll at a time over the vapor barrier. There are many types of underlayments available today. The use of acoustical underlayment will improve the feel and sound transmission of your flooring.
STEP *2 – Preparing the starter rows
-It is very important that enough expansion gaps are kept between the flooring and all the walls. This is done by placing ¼ inch (6 mm) spacers every 8 inches apart around all vertical walls.
-Measure the width of the room – perpendicular to the direction you intend to install the flooring. The last row of flooring should be no less than 1 ½ inch wide. If it is less, you should rip-saw the starter row narrower. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
-Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
STEP *3 – Gluing the floor
-In a floating floor installation, the flooring is not glued or nailed to the underlayment but is glued in the board’s side and end grooves only.
-This is achieved by applying a bead of glue on the upper side of the groove along the entire length and on the end of each plank with silicone-based T & G glue. Turn the board upsidedown when applying the adhesive to achieve proper application, when the board is turned again forinstallation with the finish side up, this will allow the adhesive to flow down and give better coverage.Do not apply adhesive on the top of the tongue.
-Install the first row of flooring with groove facing starter wall. Use a tapping block and a mallet to gently push or tap the glued strips together until no gaps are seen and making sure that end joints are square.
-At the end wall use a pry bar, if needed, to pull the ends of the boards tight. Continue laying the floor on top of the underlayment, working left to right, tapping the strips tight together. Make sure to continue using ¼ inch spacers along the wall throughout the installation.
-To avoid shifting or gapping of the flooring during installation, lay perpendicular strips of 3M blue tape
- To hold the strips together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may cause damage to the finish.
-The last row will most likely require cutting to width, but it should be no less than 1 ½ inch wide. To do this, place a full row of strips on top of the last row installed. Insert a ¼ inch spacer against the wall, and using a full width strip, trace distance from wall onto final row. Cut strips for final row to designated width. Apply glue and pull into place with a pry bar.
-Allow floor to dry for a minimum of 12 hours before removing all the spacers and allowing foot traffic. Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
460 Comment(s)
The electronic cigarette uses a battery and a small heating factor the vaporize the e-liquid. This vapor can then be inhaled and exhaled
I discovered your blog site on google and verify a few of your early posts. Continue to maintain up the superb operate. I simply extra up your RSS feed to my MSN News Reader. Looking for forward to reading extra from you in a while!…
I believe other website proprietors should take this site as an example, very clean and great user friendly layout.
The electronic cigarette uses a battery and a small heating factor the vaporize the e-liquid. This vapor can then be inhaled and exhaled
Ahaa, its fastidious conversation regarding this paragraph at this place at this webpage, I have read all that, so now me also commenting here.
tryout the new trending 2026 game.
I’m curious to find out what blog platform you have been working with? I’m experiencing some small security problems with my latest site and I would like to find something more risk-free. Do you have any solutions?
I really like how the website is designed. The layout looks clean and professional, and it’s easy to understand what the platform is offering. The information is presented in a clear way, which makes it simple for new visitors to explore the services without feeling confused. Overall, the browsing experience feels smooth and well organized.
حمل دریایی از چین با بهترین قیمت! ارسال بار از شانگهای، شنژن و ایوو به بندرعباس و بوشهر با کمترین هزینه. استعلام هزینه حمل دریایی فول کانتینر و خرده بار
Games play a vital role in human life by providing entertainment, learning opportunities, and social interaction. They have existed since ancient times and continue to evolve with culture and technology. Whether played indoors or outdoors, alone or with others, games offer enjoyment while also developing mental, physical, and emotional skills. General games include board games, card games, video games, and physical sports, all of which contribute uniquely to personal growth and social bonding.
Okay, Let’s Say I’m An Eighteen Old Country Boy Living On A Farm Looking For A Great Way To Make Money Online?: An
Amazing! This blog looks just like my old one! It's on a totally different topic but it has pretty much the same page layout and design. Wonderful choice of colors!
Fraternelle : l’encyclopédie biographique de l’Homo erectus is an expansive and lighthearted family tree available on Geneanet, presenting tens of thousands of individuals within a genealogy the author defines as a “biographical encyclopedia of Homo erectus,” structured across fields such as economy, science, politics, media, and justice.
Lotus365offiicial.com is a very well-designed and informative platform. The website layout is clean, fast, and easy to navigate, which makes the user experience smooth even for new visitors. All the important sections like sports betting, casino games, login guidance, and support information are explained clearly. I really like how the content is simple yet detailed, making it easy to understand. Overall, it looks like a reliable and well-managed website that focuses on providing useful information to users.
Sex việt nam trên nền tảng của chúng tôi được xây dựng dựa trên các tiêu chí nghệ thuật và kịch bản dàn dựng công phu. Người xem cần nhận thức rõ rằng toàn bộ các diễn biến và nhân vật trong video đều là sản phẩm của sự sáng tạo, không đại diện cho cuộc sống đời thường hay bất kỳ cá nhân cụ thể nào. Mục đích cốt lõi mà KUXX hướng tới là hỗ trợ người xem giải tỏa áp lực và đáp ứng nhu cầu thỏa mãn sinh lý một cách lành mạnh, an toàn trong không gian riêng tư. Chúng tôi tin rằng việc hiểu đúng tính chất hư cấu của nội dung sẽ giúp người dùng có những giây phút thư giãn đúng nghĩa mà không bị ảnh hưởng bởi những quan niệm sai lệch về thực tế đời sống hay các giá trị đạo đức xã hội.
Judging by the way you write, you seem like a professional writer.*;”`-
Explore Gw Geneanet Bloom, a genealogy platform where users can explore family trees, track ancestry, and connect with relatives worldwide. Build, share, and grow your family heritage today.
It truly is moreover a great write-up which i undoubtedly relished reviewing. It may not be specifically day-to-day which i build an opportunity to get whatever.
Casino Site is an online platform that allows players to enjoy hundreds of casino games, including slots, blackjack, and roulette.
Gw Geneanet Nova is an innovative genealogy platform for tracing family trees, discovering ancestry, and connecting with relatives worldwide. Build, share, and grow your family history with ease.
Leave a Comment